top of page
casita-wahoo (1)_edited.jpg

Casa Wahoo

Expected Completion
December 2022

Beachfront in the exclusive development of Montemar.  Pictured is the 2 bedroom/2 bath Casita.  The main Casa will be 4 bedrooms and 2.5 baths. Other features of the property will include a pool, boat ramp, palapa garage, and solar energy.  The owners have also asked for a special roof design that will capture much of the rainwater during the hurricane season.  Construction to begin November 2021.

Master Bathroom

Algunos de nuestros proyectos recientes

master bathroom design

Master Bathroom

bottom of page